Skip to product information
1 of 4

Nurburgring Nordschleife Graffiti at Pflanzgarten

Regular price $19.99 USD
Regular price Sale price $19.99 USD
Sale Sold out
View full details

Product Details

The Nürburgring Nordschleife's iconic Pflanzgarten section descends through a dense forest, its dark asphalt blanketed with vibrant layers of fan-painted names, tags, and markings. Red-and-white curbing traces the inside of the bends while steel guardrails border the course, leaving the graffiti-covered pavement empty between the wooded banks when no cars are on track.

Years of overlapping fan paint and tire marks give the racing surface a rough, weathered appearance deeply rooted in Nürburgring culture. Grass banks, dark trees, and Armco barriers sit tightly against the circuit as it snakes through the woods, preserving the track's raw, historic energy from one bend to the next.

Display it in a game room or showroom with another Nurburgring themed print for a broader enthusiast look. A framed Nurburgring track map echoes the circuit, while a textured charcoal area rug carries the dark asphalt tones into the surrounding space.


  • Small: Each panel is ~4" wide. Best suited for small wall spaces, such as a bathroom, kitchen, small office etc. Best for viewing from short distances.
  • Medium: Each panel is ~8" wide. Best suited for mixed use applications, where the print may most often be viewed close up or from a short distance.
  • Large: Each panel is ~12" wide. A large array of uses, from a living room or dining room wall, to a dorm room, conference room or office. Makes a great statement in any medium to large size room.
  • Extra Large (BEST SELLER): Each panel is ~16" wide. Best viewed from medium distances and above (6 feet+). Can be the perfect subtle piece to compliment a room's décor or a dominant statement piece to decorate a business or anywhere else that a beautiful center piece is needed. They can just as easily set a tranquil mood in a spa or electrify a games room.
  • Epic (NEW): Each panel is ~20" wide. Best viewed from medium/long distances and above (8 feet+), our "Epic" prints will instantly decorate even your largest blank walls. One of our giant, gorgeous prints will show off your perfect taste and can be swapped for a different design in seconds, allowing instant redecorating for changing seasons, special occasions or "just because".

Mounting Options

GALLERY WRAPPED: If you order your print GALLERY WRAPPED (which we highly recommend), you will receive all 5 panels professionally stretched and mounted to our custom-built wood stretcher bars in the classic gallery wrap style. 100% hand-made in our shop with love and attention to detail, our gallery wrapped prints are ready to hang upon delivery.

PRINTED FABRIC ONLY: For the Do-It-Yourselfers, our prints are also available as PRINTED FABRIC ONLY linen canvas fabric panels.

If you order your print as PRINTED FABRIC ONLY you will receive only the five pieces of canvas fabric, printed with the design of your choice and rolled up for shipping.

These fabric panels include a white border for attaching to stretcher bars, foam core or whatever mounting method you choose. This border can be trimmed upon request.

To achieve the best fit and finish at the lowest cost we do recommend that you order your print gallery wrapped and let us do the stretching and mounting for you, but the choice is ultimately up to you!

We use only the highest quality UV-protected and water-resistant inks in our proprietary printing process. We present the resulting prints on a canvas fabric composed of our exclusive linen/poly blend. This, along with our decades of combined experience in the printing industry guarantee that your print will maintain its gallery-quality appearance and color precision throughout its lifetime.

All devices produce slightly different color profiles, and as such the colors of your finished print may differ slightly in real life than on your device. Product photos are computer generated, not to scale, and for illustrative purposes only. Please refer to our size guide for actual dimensions.

Check out our customer reviews to see real life photos of verified purchases:

https://www.gotithere.com/pages/reviews